Delete patch before workspace closed
Posted: 15 Jun 2025, 00:02
In my HH6 workspace kontakt is crashing on exit and causing Usine to hang and never close properly. If I delete the patch before exiting it is OK.
How can I automate the following on exit :-
1. Detect Usine is about to exit
2. Ask the user if they want to save
3. Optionally trigger Workspace Save As
2. Delete the patch containing kontakt
3. Disallow normal save on exit so I cannot save the workspace with kontakt removed
4. Exit Usine.
Thanks.
How can I automate the following on exit :-
1. Detect Usine is about to exit
2. Ask the user if they want to save
3. Optionally trigger Workspace Save As
2. Delete the patch containing kontakt
3. Disallow normal save on exit so I cannot save the workspace with kontakt removed
4. Exit Usine.
Thanks.